Town of Gilbert · Maricopa County, Arizona

Do you need a permit in Gilbert?

Gilbert publishes a size line for accessory buildings, a flat fee for walls and fences, and a separate set of rules for guest quarters and secondary dwellings.

Depends on size and attachment

Patio cover, pergola, and ramada

Gilbert’s land code ties the accessory-structure permit to size. It does not publish a separate exemption that uses the words pergola or ramada.

Size or height threshold

Accessory structures over the published size

Land Development Code section 2.106.B says accessory structures requiring a building permit (larger than 200 square feet) have extra location rules. An accessory structure may sit inside the zoning-district building envelope. In SF-15, SF-10, SF-8, SF-7, SF-6, SF-D, and SF-A, it may also sit in the side and rear setbacks if it is in the rear half of the lot. In SF-43 and SF-35, that area is the rear two-thirds of the lot. Except for pools, a structure in those setback areas that is 10 feet tall or less needs a 5-foot setback. For each foot of height above 10 feet, add one foot of setback. Maximum height is 20 feet, except 30 feet in SF-43 and SF-35. The structure cannot be built before the house.

Source: Gilbert Land Development Code, Article 2.1, section 2.106 · checked 2026-11-19

Rule

How the town describes the permit line

The town’s code FAQ, written about storage sheds and citing Land Development Code section 2.106.B, says any building that is 200 square feet or larger needs a building permit and is subject to the prescribed setbacks. It also says a permit is required if electrical or plumbing is installed, or if the shed is connected to the house or another structure, and that structures less than 200 square feet do not require a permit. That answer is not reprinted on the FAQ under a patio-cover heading.

Source: Gilbert FAQ, Municipal Code and Land Development Code · checked 2026-11-19

Rule

Covered patio standard detail

The permits page lists Covered Patio among its typical details, next to carport, masonry wall, and residential fence details. That is a drawing aid for a submittal. It is not a sentence that says every patio cover is exempt.

Source: Gilbert permits page, typical details · checked 2026-11-19

Rule

New-home covered patio, which is a different rule

Section 2.106.E requires a covered patio on a new single-family house: at least 80 square feet in SF-43, SF-35, SF-15, SF-10, SF-8, SF-7, and SF-6, and at least 60 square feet in SF-D and SF-A. No dimension may be less than 6 feet, measured from the dwelling face to the inside of the post or wall. That is a standard for new houses, not a permit exemption for a cover you add later.

Source: Gilbert Land Development Code, Article 2.1, section 2.106.E · checked 2026-11-19

Fee

Building permit and plan review

The Development Services fee schedule revised September 15, 2026 prices building permits from valuation. The table starts at $50 for work valued from $1 to $1,100, then $50 for the first $1,100 plus $3 for each additional $100 up to $2,000, then $75 for the first $2,000 plus $12.50 per additional $1,000 up to $25,000, then $355 for the first $25,000 plus $9 per additional $1,000 up to $50,000, then $580 for the first $50,000 plus $6.25 per additional $1,000 up to $100,000, then $895 for the first $100,000 plus $5 per additional $1,000 up to $250,000, with further tiers above that. Plan review is 65 percent of the building permit fee. The building-permit table was amended by Resolution 4563, effective July 1, 2025. Valuation is taken from the International Code Council table, which the building official updates on July 1 each year. There is no flat patio-cover fee on that table. A residential fee calculator is linked from the permits page.

Source: Town of Gilbert Development Services fee schedules · checked 2026-11-19

Turnaround

Review goal

The plan-review time-frame sheet linked from the permits page does not name patio covers. For residential work it lists a first-review / second-subsequent goal of 8/4 working days for plan changes under 10 sheets, room additions, and other miscellaneous work, and 12/8 working days for single-family custom or standard plans. The sheet says these are goals in working days, counted from the first full day after submittal, and that the plan-review supervisor can adjust them. The copy we read does not print its own revision date.

Source: Gilbert plan review time frames · checked 2026-11-19

Not published

Typical cost to build

Gilbert’s fee schedule and land code do not publish a construction-cost range for a patio cover, pergola, or ramada. YardPermits is not adding one.

Source: Town of Gilbert Development Services fee schedules · checked 2026-11-19

A permit may be required

Block wall and fence

Gilbert publishes fence and wall permit fees and a pool-barrier rule. Its code FAQ does not print one maximum fence height for every yard.

Rule

Permit question on the code FAQ

The code FAQ says a fence has to follow town regulations and that a permit may be required. It sends height and permit questions to Development Services at (480) 503-6700. It does not state a height under which every fence is exempt.

Source: Gilbert code FAQ · checked 2026-11-19

Fee

Wall and fence permit fees

The fee schedule lists walls and fences at $120 when pulled with a single-family permit, $180 as a separate single-family permit, $260 as a separate non-single-family permit, and $700 for a subdivision perimeter wall or fence. Those miscellaneous building fees were amended by Resolution 4563, effective July 1, 2025. The schedule file was revised September 15, 2026.

Source: Town of Gilbert Development Services fee schedules · checked 2026-11-19

Turnaround

Fence review goal

The plan-review time-frame sheet lists fences and walls on individual lots at a 3/3 working-day goal for the first review and the second subsequent review. Times are working days and can be adjusted for complexity and workload.

Source: Gilbert plan review time frames · checked 2026-11-19

Rule

Pool barrier

The town FAQ, citing Land Development Code 4.107.B, says every swimming pool must be enclosed by walls of the house or by a solid wall, chain-link fence, or wrought-iron fence not less than 5 feet and not more than 6 feet high. Openings must be small enough that a 4-inch sphere cannot pass through or under the fence or gate. Gates must be about the same height as the fence, self-closing, and self-latching. A double-width RV gate that is not the only way in does not have to be self-closing and self-latching, but it must be padlocked when it is not in use. The permits page also links a pool-fence document identified as Article 5.2.7. Use the current code section if the two labels disagree.

Source: Gilbert FAQ, pool fencing · checked 2026-11-19

Not published

Ordinary fence height

The code FAQ does not publish a single front-yard or rear-yard maximum for a residential fence that is not a pool barrier. Call Development Services before you assume a height is allowed.

Source: Gilbert code FAQ · checked 2026-11-19

Depends on size, utilities, and attachment

Storage shed

The town FAQ answers the shed question directly. Setbacks for sheds that need a permit are in the land code.

Size or height threshold

When a shed needs a permit

The town FAQ says any building that is 200 square feet or larger needs a building permit and the prescribed setbacks. A permit is also required if electrical or plumbing is installed, or if the shed is connected to the house or another structure. Structures less than 200 square feet do not require a permit. The answer cites Land Development Code section 2.106.B and gives Development Services at (480) 503-6700.

Source: Gilbert FAQ, storage sheds · checked 2026-11-19

Setback

Setbacks once a permit is required

Section 2.106.B applies to accessory structures that require a permit because they are larger than 200 square feet. In the side and rear setback areas, a structure 10 feet tall or less needs 5 feet of setback. Above 10 feet, add one foot of setback for each extra foot of height. The structure has to be in the rear half of the lot in the smaller single-family districts, or the rear two-thirds in SF-43 and SF-35, unless it stays inside the normal building envelope. Maximum height is 20 feet, or 30 feet in SF-43 and SF-35.

Source: Gilbert Land Development Code, Article 2.1, section 2.106.B · checked 2026-11-19

Fee

Permit fee

A shed that needs a building permit is priced from the valuation table in the Development Services fee schedule, not from a flat shed fee. The table starts at $50 through $1,100 of valuation. Plan review is 65 percent of the building permit fee. A separate residential electrical or plumbing permit, if the work is pulled that way, is $150. The table was amended by Resolution 4563, effective July 1, 2025.

Source: Town of Gilbert Development Services fee schedules · checked 2026-11-19

Permit required for the building

Guest quarters and secondary dwelling

Gilbert regulates guest quarters and secondary dwellings as two different things. The permits page also links an accessory-dwelling guide. The rules below are the ones printed in the land code section we read.

Rule

Guest quarters

Section 2.106.C allows one guest quarters, and it cannot be built before the house. It must sit inside the building envelope. It may be attached to the house. It has to use the house utilities. Ranges, ovens, and built-in cooking are prohibited, and it cannot be rented separately from the house. It is limited to a single floor, may not exceed the house’s maximum height for that zoning district, and may sit above an attached or detached garage. Materials, colors, and style have to be compatible with the house.

Source: Gilbert Land Development Code, section 2.106.C · checked 2026-11-19

Rule

Secondary dwelling

Section 2.106.D allows one secondary dwelling, and it cannot be built before the house. It sits inside the building envelope, except that one built over a detached garage must not exceed the height of the house. The entrance cannot be visible from the street the house faces. It uses the house utilities, needs one extra off-street parking space under section 4.203.X, and cannot have interior access to the house. A full kitchen is allowed, and renting it is allowed. Design has to be compatible with the house. The section we read does not set a maximum floor area.

Source: Gilbert Land Development Code, section 2.106.D · checked 2026-11-19

Size or height threshold

Building permit

The town FAQ says any building of 200 square feet or larger needs a building permit. Guest quarters and secondary dwellings are buildings under section 2.106. Plan on a building permit and confirm the submittal with Development Services. The permits page links an Accessory Dwelling Unit Guide; this page does not copy numbers from that guide.

Source: Gilbert FAQ on buildings of 200 square feet or larger · checked 2026-11-19

Fee

System development fees for an accessory dwelling unit

The fee schedule lists accessory-dwelling system development fees per housing unit: parks and recreation $2,339.50, traffic signals $438.50, roads $752.50, police $284.50, and fire $361.75. Those fees were adopted April 16, 2024 and effective July 1, 2024. They are separate from the valuation-based building permit fee and the 65 percent plan-review fee.

Source: Town of Gilbert Development Services fee schedules, system development fees · checked 2026-11-19

Not published

Square-foot cap and build cost

Section 2.106 does not print a maximum square footage for a secondary dwelling, and the fee schedule does not print a typical construction cost. The permits page links a separate Accessory Dwelling Unit Guide that was not used for the numbers on this page.

Source: Gilbert permits page, Accessory Dwelling Unit Guide link · checked 2026-11-19

Separate from the city

HOA architectural approval

A town permit and your HOA’s architectural approval are different decisions. Gilbert’s permit pages we used do not say the town reviews your CC&Rs.

Rule

Association approval is not a city sign-off

Arizona Revised Statutes section 33-1817 says that, for planned communities, approval of plans or of the construction by the association or its design review committee is not a representation or warranty that the plans or construction comply with governmental requirements or with engineering, design, or safety standards. The same statute says approval of architectural designs, plans, and amendments shall not be unreasonably withheld. If your community has an architectural committee, that review is still yours to get. It does not replace the town permit.

Source: A.R.S. § 33-1817 · checked 2026-11-19

Not published

What Gilbert’s permit pages say about HOAs

The permits page and the code FAQ we used for sheds, pools, and fees do not say that a town permit includes HOA approval, and they do not say the town enforces CC&Rs. Ask your association before you apply.

Source: Gilbert permits, applications, and checklists · checked 2026-11-19

Who to call

Who to call

Permits desk

The permits page says to contact a Development Services representative at (480) 503-6700 or [email protected]. It also says customer service hours for most town services are 7 a.m. to 6 p.m., Monday through Thursday.

Source: Gilbert permits, applications, and checklists · checked 2026-11-19

Who to call

Office address

The plan-review time-frame sheet prints the Development Services address as 90 E. Civic Center Drive, Gilbert, AZ 85296, and the phone as (480) 503-6700.

Source: Gilbert plan review time frames · checked 2026-11-19

Questions homeowners ask

Does a storage shed need a Gilbert permit?

Any building 200 square feet or larger needs a building permit and the prescribed setbacks. A permit is also required if the shed has electrical or plumbing, or if it is connected to the house or another structure. Structures under 200 square feet do not require a permit under the town FAQ.

Source: Gilbert FAQ, storage sheds · checked 2026-11-19

What does Gilbert charge for a fence permit?

The fee schedule lists $120 with a single-family permit, $180 as a separate single-family permit, $260 as a separate non-single-family permit, and $700 for a subdivision perimeter wall or fence.

Source: Town of Gilbert Development Services fee schedules · checked 2026-11-19

Does HOA approval replace the town permit?

No. Arizona law says association approval of plans is not a warranty that the work meets governmental requirements. Gilbert’s permit pages we used do not fold HOA review into the town permit.

Source: A.R.S. § 33-1817 · checked 2026-11-19

Contractor quotes

Get quotes from local builders

Quote requests are turned off. This page does not collect your project, does not store a form submission, and does not load a scheduling or advertising script.

When lead-gen is switched on, requests will go to [email protected]. That address is a placeholder until Chris Wahl connects it.